|
- 语言编码 : 英文
- 软件版本 : sm400
- 资源类型 : 韩国原厂技术通告
- 非VIP会员请直接到三星贴片机综合讨论专区发帖提问。
- VIP用户可以直接联系技术支持QQ获取在线技术支持。
- 技术支持QQ:1504561681
- 开通VIP
Procedures required when replacing old SBC with SM400 series mass pro) v8 e0 u) |4 f0 O/ L
duction SBC.
2 H* A" @) w9 p2 k/ ^3 [% n1. Backup MMI fold of the existing equipment into D or E drive.
) e' ?: n8 _6 e4 m3 U" e: T0 a2. Disconnect old SBC from rack.
6 r* d- Y! I6 V0 U: n3. Disconnect cooler and memory from old SBC.
u1 f( o/ }; j3 I7 U* G" ?4. Install new CPU at new SBC and assemble cooler disconnected from the existing SBC.
+ d$ S! c l+ _, G4 \(Never use Intel Cooler included in the box CPU because of weak durability.)7 |% o8 a4 X4 e
5. Mount the memory disconnected from old SBC.0 f% _0 c. g" W) W& k a. I" `% ]
6. Assemble SBC at rack and install the supplied Com Port bracket, if the facility uses IT,
6 o: b( ]# ?3 Y2 cand connect it to SBC Com Port Connector.
3 J) O+ ^5 @, M# \+ W. U) l7. Receive SM400 Series XP Embedded SP3 ISO file from KT Hard, built Recovery DVD, and3 Y& A7 c' |7 W) c0 N% L
then install only OS at C drive of hard disk.4 C1 ?1 x- U+ x9 X9 J
8. After a completion of Recovery and PnP process, reboot again and install MMI.
6 Z) p/ {. ^* ?9. Overwrite system/PCB folder of back-up MMI into C:\SmartMMI.
$ ~* K3 c/ Z( v. j0 O% k10. Required Materials9 I# T/ f7 X* ~8 ?
2 C0 n2 N' y; i6 {+ M8 U! X
8 e8 d: W. q: ]% @
|
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有账号?立即加入
x
|